Assembly
Assembly Manual
We recommend following our detailed PDF manual for the step-by-step assembly.

Preflight Checks
Before powering on your enclosure for the first time, perform these checks:
Electrical Connections
- Check Polarity: Ensure red goes to positive (+) and black to negative (-) on the PSU.
- Inspect Crimps: Make sure no loose wire strands are visible that could cause a short.
- Strain Relief: Ensure all cables are secured and not under tension.
First Time Power Up
- Turn on the PSU switch.
- Verify the screen turns on.
- Complete first time startup script on screen
- Enjoy!
If you smell burning or see smoke, turn off power IMMEDIATELY and check your wiring.
Last updated on